Why not replace Caltrain with BART? Won’t that cost the same as electrifying Caltrain?
The quick answer is no. BART requires separate tracks and infrastructure (because it runs on non-standard gauge tracks). To replace Caltrain with BART, all the Caltrain infrastructure would have to be removed and rail service would have to be shut down rail service for years during the construction period. Replacing…